A i r e d a l e
I n t e r n a t i o n a l
Location: Leeds
In December 2015, our experts helped to rebuild an office space after fire damage for one of the UK’s leading air conditioning manufacturers, Airedale International. The client was rebuilding their Leeds site after a fire destroyed the building, and they assigned us to supply and fit furniture solutions that would complement the decor, while perfectly suiting the intended use of the building.
We worked alongside a York-based architect, Darnton B3, who guided the look and feel of the project, and we worked carefully in line with their vision. As part of the project, we took our clients to London to decide on the furniture for their new building to create a space that looked sleek and modern, as well as being fit for purpose.
Airedale International
Our Case Studies